We are driven by goal oriented.
Some of our projects.
The potential risks of failing to achieve objectives are identified and fully considered in the planning and control process the quality of services and products delivered and the level of client satisfaction are regularly measured, and the findings used in a planned and preventative improvement process.
wdt_ID | wdt_created_by | wdt_created_at | wdt_last_edited_by | wdt_last_edited_at | S/N | CLIENT | PROJECT DESCRIPTION | DATE OF AWARD | REMARK |
---|---|---|---|---|---|---|---|---|---|
1 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 1 | NIGERIAN AGIP/HOECHY DEVELOPMENT LTD. | DRILLING OF 3NOS BOREHOLES AND ANCILLARY WORKS FOR OBIAFU LOCATION FIRE EMERGENCY WORK | 2022/2023 | COMPLETED |
2 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 2 | NATIONAL ENGINEERING & TECHINCAL COMPANY (NETCO) | FABRICATION AND ERECTION OF OVERHEAD TANK | 2022/2023 | COMPLETED |
3 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 3 | NIGERIAN AGIP/HOECHY DEVELOPMENT LTD/HOECHY DEVELOPMENT LIMITED | DRILLING OF TWO NOS WATER BOREHOLE AT EBOCHA RESIDENCE | 2022/2023 | ONGOING |
4 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 4 | SHELL PETROLEUM DEVELOPMENT COMPANY/AMBUTECH SERVICES | OPERATION AND MAINTENANCE OF WATER TREATMENT PLANT | 2022/2023 | COMPLETED |
5 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 5 | GENESIS RESTURANT | SUPPLY OF 150KVA GENSET | 2021/2022 | COMPLETED |
6 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 6 | TONYVEST | SUPPLY OF 500KVA GENSET | 2023 | COMPLETED |
7 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 7 | FIRST INDEPENDENT POWER LIMITED (FIPL) | REHABILITATION OF ELEME INTERNAL ROAD | 2021/2022 | COMPLETED |
8 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 8 | NIGER DELTA DEVELOPMENT COMMISSION (NDDC) | CLEAR/DESILT BLOCKED SECTIONS OF ISOKO CANAL, AKURE SOUTH L.G.A, ONDO STATE | 2021/2022 | COMPLETED |
9 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 9 | NIGER DELTA DEVELOPMENT COMMISSION (NDDC) | COMMISSIONIONG AS A DESIGN AND SUPERVISING CONSULTANT FENCING OF EGBORODE PRIMARY SCHOOL WITH GATE HOUSE AND ADMINISTRATIVE BLOCKAT OKPE LOCAL GOVT. AREA, DELTA STATE | 2019/2021 | COMPLETED |
10 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | CONSTRUCTION OF I NOS. 6 CLASSROOM BLOCK AND STAFF QUARTERS AT BENIKRUKU COMMUNITY SECONDARY SCHOOL, BENIKRUKRU, WARRI SOUTH WEST LOCAL GOVT. AREA, DELTA STATE. | ||||
11 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | CONSTRUCTION OF 500 STUDENTS CAPACITY HOSTEL AT WESTERN DELTA UNIVERSITY, OGHARA, DELTA STATE. | ||||
12 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 10 | NIGER DELTA DEVELOPMENT COMMISSION (NDDC) | CONSTRUCTION OF EKREHAVWIE/OGUNAME/OPBORI, UGHELLI NORTH LOCAL GOVT. AREA, DELTA STATE. | 2019/2021 | COMPLETED |
13 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 11 | NIGER DELTA DEVELOPMENT COMMISSION (NDDC) | EMERGENCY REPAIRS OF FAILED AND UNMOTORABLE SECTIONS OF OBA-ILE INTERNAL ROADS | 2019/2021 | COMPLETED |
14 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 12 | NIGER DELTA DEVELOPMENT COMMISSION (NDDC) | COMMISSIONING AS A DESIGN AND SUPERVISING CONSULTANT CONSTRUCTION OF INTERNAL ROADS IN AKINIMA, ENGENNI, AHOADA WEST LOCAL GOVT AREA, RIVERS STATE | 2019/2021 | COMPLETED |
15 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | CONSTRUCTION OF FARM ROAD AND DRAINS, AKPAJA, ELEME LOCAL GOVT. AREA, RIVERS STATE. | ||||
16 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | CONSTRUCTION OF UMU-EBEREKE ROAD OFF OMUSOYA ROAD, HIGH TENSION, OYIGBO LOCAL GOVT. AREA, RIVERS STATE. | ||||
17 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | CONSTRUCTION OF WORLU-WACHUKWU ROAD, RUKPOKWU, OBIO AKPOR LOCAL GOVT. AREA. RIVERS STATE. | ||||
18 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 13 | FAITH BAPTIST CHURCH PORTHARCOURT | CONSTRUCTION OF ULTRA-MODERN CHURCH AUDITORIUM | 2019/2020 | COMPLETED |
19 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 14 | RIVERS STATE UNIVERSITY OF SCIENCE AND TECHNOLOGY | CONSTRUCTION OF SHOPPING COMPLEX BUILDING | 2019/2020 | COMPLETED |
20 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 15 | HOECHY DEVELOPMENT LIMITED/NIGER DELTA PETROLEUM RESOURCES (NDPR) | REPAIR, STABILIZATION AND ASPHALTING OF OGBELE FIELD ROADS | 2023 | ONGOING |
21 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 16 | HOECHY DEVELOPMENT LIMITED/NIGERIA AGIP OIL COMPANY (NAOC) | PREPARATION OF MINOR LOCATIONS & ROAD DRILLING RIG ACTIVITIES IN LAND AREA UMUORU 4 ROADS AND LOCATION | 2019/2021 | COMPLETED |
22 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | OBIAFU ACCESS ROAD | ||||
23 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | ODUGIRI ACCESS ROAD | ||||
24 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | MGBEDE 5 & 6 LOCATIONS | ||||
25 | extreme | 10/02/2024 11:52 AM | extreme | 10/02/2024 11:52 AM | 17 | NDDC SPECIAL PROJECT | RENOVATION OF NDDC BUILDING | 2018 | COMPLETED |